The key to effective crack sealing is preparation. Extend the life of your pavement by routing a reservoir, cleaning with a heat lance then applying properly heated rubberized sealant. The R3 asphalt crack router utilizes the latest technology to provide accurate, high-performance routing. The R3 dust suppression safely mitigates dust for up to 45 minutes of constant cut time.
• 10 Gallon Dust Suppression Tank
• Electric Start 27 hp Kohler Engine
• 6.75-gallon polyethelyne fuel tank
• Dual stage air cleaner
• Belly-Bar quick shut down system
• Quick Stop Anti-Kickback
• Large Depth Gauge
• Heavy-duty roller bearings on drum
• Cut-Control Option Knob